Siddhivinayak Pipe Industries - On Going Project

1. KALATHAIYA ENGINEERING & CONSTRUCTION LTD.


Widening of Pipli - Bhavnagar Section Package 01 from 136 + 025 to 169 + 328 (Design Chainage KM 136 + 000 to 169 + 308) near ADHELAI Village to NARI Junction to Four Laning from Existing 10 Meter Wide in the State of Gujarat on Hybrid Annuity Mode.


2. Yash Constructiion Co. - Bhavnagar


Providing, Lowering, Laying, Jointing, Testing and Commissioning of Sewer Collection Network and Designing, Constructing, Testing & Commissioning of Sewage Pumping Stations and Pumping Mains including electro - mechanical works along with Operation and maintenance and defect liability period for 5 years at Sidsar, Tarasmiya, Akwada and Ruwa villages, Bhavnagar under AMRUT Grant.


3. VELJI RATNA SORATHIA INFRA PVT LTD.


Providing, Lowering, Laying, Jointing, Testing and Commissioning of Sewer Collection Network and Designing, Constructing, Testing & Commissioning of Sewage Pumping Stations and Pumping Mains including electro - mechanical works along with Operation and maintenance and defect liability period for 5 years at Sidsar, Tarasmiya, Akwada and Ruwa villages, Bhavnagar under AMRUT Grant.


4. Sadbhav Engineering Limited


Construction of Sewrage network on kansara river banks and contructing Kansara River rejuvenation works including strom water guiding concrete banks, Drops structures, rain water harvesting structures, outfall structure and chain - link fencing of Bhavnagar Municipal corporation Bhavnagar including operation And Maintenance for 3 (Three) Year under SJMMSVY Scheme including defect Liability.


5. Sadbhav Engineering Limited


Four Laning of Una - Kodinar Section of NH-8E from KM. 180.478 to KM. 221.610 (PACAKGE - V) in the state of Gujarat under NHDP Phase IV on Hybrid Annuity Mode (NHAI).


Siddhivinayak Pipe Industries - Completed Project

1. AGROH Infrastructure Developers Pvt. Ltd.


Four Laning of Kagvadar - Una Section of NH-8E from KM. 140.470 to KM. 181.450 (PACKAGE - IV) in the state of Gujarat under NHDP Phase IV on Hybrid Annuity Mode (NHAI).


2. AGROH Infrastructure Developers Pvt. Ltd


Four Laning of Kodinar - Veraval Section of NH-8E from KM. 222.400 to KM. 263.700 (PACKAGE - VI) in the state of Gujarat under NHDP Phase IV on Hybrid Annuity Mode (NHAI).


3. Montecarlo LTD.


GC Work between Kothgangad (Excl.) and Botad (Incl.) in Ahmadabad and Bhavnagar Division of Western Railway.


4. SUBH INFRA C/O DRA - KIRAN (JV)


DAS - JLR (G.C. Project) Ch-26.020 to 75.520,


5. SADBHAV ENGINEERING LIMITED


UPGRADATION TO 6 LANE WITH PAVED SHOULDERS OF SAYLA-BAMANBORE SECTION OH NH-8A(NH-47) FROM


6. SADBHAV ENGINEERING LIMITED


UPGRADATION TO 6 LANE WITH PAVED SHOULDERS OF BAGODARA-LIMBDI SECTION OH NH-8A(NH-47)


7. MKC INFRASTRUCTURE LTD.


Improvement of road connection important tourist destination under pravasi path for four lanning palitana talaja road S.H.31k.m 0/0 to 32/5 Ta.palitana dist. Bhavnagar on engineering,procurement & construction (EPC) mode.


8. ANKITA CONSTRUCTION


Underground drainage work at Botad, Dist. Botad, under the ownership of GWSSB


9. KMC Consruction Limited


Widening to four lanes and strengthening of existing two lane carriage ways from Udaipur to Rishabhdev KM. 270.000 to KM. 340.000 UG
(PACKAGE - I) of Udaipur to Ratanpur Gandhinagar section of NH 8 in the state of Rajasthan (NHAI).


10. JILIN Sadbhav Joint Venture


Four Laning of Gagodar to Radhanpur Highway Road Project NH15 from KM. 138.800 to KM. 248.000 (PACKAGE - V) in the state of Gujarat (NHAI).


11. DIC NCC Joint Venture


Four Laning of Morbi to Gagodar Highway Road Project (PACKAGE - IV) in the state of Gujarat (NHAI).


12. D.R. Agrawal Infracon Pvt. Ltd.


Four Laning of Disa to Randhanpur Highway Road Project (PACKAGE - VI) in the state of Gujarat (NHAI).


13. Sadbhav Engineering Limited


Four Laning of Dhule-Palesnar Highway Road Project NH3 from KM. 168.500 to KM. 257.100 in the state of Maharashtra (NHAI).


14. Sadbhav Engineering Limited


Four laning of Gomti Chauraha to Udaipur section of NH-8 from KM. 177.000 to KM. 260.100 in the state of Rajasthan (NHAI).


15. Sadbhav Engineering Limited


Four laning of Rajsamand-Bhilwara section of NH-7 from KM. 0.000 to Km. 87.250 in the state of Rajasthan on DBFOMT basis (NHAI).


16. Sadbhav Engineering Limited


Widening and strengthening of jodhpur-Barmer section NH-112 (Jodhpur to Pachpadara) two lanes with paved shoukder/ four lanes from KM. 140.000 to KM. 225.615 in the state of Rajasthan on EPC mode (NHAI).